Previous to joining WPL in September 2013 as Project Manager, Dan successfully delivered a number of projects in the engineering sector. Having done Project Management for 5 years and qualified as a Project Management Professional, Dan has worked for...
Simon is our Sales and Marketing Director and brings 25 years experience in the wastewater treatment industry, having worked in this sector his entire career. He also holds an Honours Degree in Biological Science from Portsmouth University. He began...
Julie joined WPL in 2008 as the HR Manager. Julie comes from a finance background before moving into HR in 2000. She keeps up with what’s happening and best practices in the HR world by attending HR Forums and CIPD events. Julie is a Chartered...
Lee is WPL’s highly motivated Operations Manager with a sustained record of achievement and with nearly 30 years of manufacturing and operational experience behind him.
Ian has 20 years of experience in the wastewater industry, currently working for WPL as Assembly Worker.
Andy has worked for WPL for 10 years having worked in different roles within the company; he began his WPL career on shop floor, following on to Assembly Deputy Manager and then to Laminating Supervisor before landing his current role of...
Mark works for WPL as Assembly Worker. He previously worked in laminating for both WPL and in his previous roles.
Ben is an integral part of the WPL team currently working as Assembly Worker.
Marc has been a valued member of the WPL team for the past 16 years, currently working as Site Team Leader. He has a professional background in purchase, sales and assembly. Marc also holds many qualifications including 17th edition City &...
Sophie joined WPL in 2018 as Operations Administration Assistant with a wealth of operations knowledge and administrative experience behind her.
Andrew is our Sales Manager for our Water Utility customers. He has over 25 years’ experience within the water industry and is qualified to BSc(Hons) level in Applied Chemistry, and is a Post Graduate level in management studies. Recent projects...
Howard joined WPL in September 2018 as Transport and Production Planner with five years experience in the haulage industry and a Business Management degree from Southampton Solent University.
Sarah joins WPL, having studied through the chartered Institute of Marketing and in excess of 15 years experience in sales and marketing roles. Sarah brings a wealth of business and consumer sales/account management skills to her current role at WPL...
Becky is an Account Manager at WPL for the Diamond and HiPAF range, she has worked at WPL for 13 years and has an NVQ in customer service.
Valentin is our Sales Manager for France, developing our French distribution network for WPL environmental wastewater solutions. He has a BA (Hons) in International Business Management and a Master's degree in Sales Strategy &...
Kevin is our Product Supervisor working at WPL for 13 years. He achieved an HND in Motor Vehicle Engineering and Management at college and continues to develop his professional skills at WPL.
Laura joined WPL as a marketer in 2018 with several years experience in digital and communications in addition to a BA (hons) in Marketing from The University of Portsmouth.
Stuart works for WPL as Assistant Team Leader.
Olly joined WPL's engineering team in 2018 as a Project Design Engineer with a BSc in Product Design from The University of Portsmouth.
Razvan is our Process Design Engineer. Razvan graduated from university in Romania with a degree in Civil Construction Engineering. He has a background of over 12 years in construction engineering and is highly proficient with AutoCAD...
Andrew is WPL’s Technical Director. Andrew has worked for WPL since 2006 and has nearly 30 years’ experience in the water and wastewater treatment industry. Andrew has a background in traditional engineering and technical business development and...
Adam is our Industrial Key Account Manager and is the first point of contact for anyone wishing to develop a relationship with WPL for industrial wastewater treatment.
Monica joined WPL in 2017 as Proposals Engineer with a wealth of knowledge in wastewater treatment.
Rosy joins us as Credit Control and Finance Assistant, having gained her finance experience from her last two roles within local companies and achieving her AAT Level 2 and 3 accounting qualifications. Rosy is now working towards achieving her AAT...
Nick joined WPL in 2019 as Purchasing Coordinator with 20 years experience in buying and procurement.
Dominic has 21 years’ experience in the wastewater treatment industry, having worked in the sector his entire career, including as a member of a British Water technical forum and a university lecturer.
Neil works for WPL as an Assembly Worker.
Stuart joined WPL 15 years ago, bringing with him 5 years of experience as part of a banking accounts team. He began his career with WPL as Accounts Assistant, moving on to Assistant Management Accountant and then to Managing Accountant before...
Tom is WPL's Engineering Manager, having started working with the company in early 2015. Tom holds a BSC in Product Design from the University of Bournemouth and continued on from here to work for an injection moulding firm, as Development Engineer....
Gareth is Managing Director and started his career working with Ernst & Young in Southampton, moving onto KPMG where he was promoted to audit manager. A career move into industry then followed where he worked extensively for SME’s in industries...
With experience and knowledge of designing and project management, Frantisek joined WPL in 2012 as Sales Manager for Central Europe to extend WPL’s offering into Europe. Frantisek’s experience in design engineering also means he is a confident...
Gareth joined WPL in 2017 as Site Service Coordinator, with a vast range of experience behind him.
Our distillery is building a reputation as one of the greenest in the world, so it was important for every part of our renovation and building work to be carried out to the highest possible environmental standards.
The idea of repurposing of WPL’s HiPAF wastewater treatment plant was inspired and is exactly the kind of sustainability initiative we expect from our supply chain partners.
Finding a cost effective solution for the treatment of wastewater has led Metropolitan to install the on-site WPL Hybrid-SAF™ plant – which meets the entire needs of the Castle Hill development and will be delivered on time and to budget.”
“The area’s fishing ponds are used for fish farming as well as leisure, so it was important to protect them. Installation of the project was executed without any problems and WPL worked with us very proactively. We’re happy they will assist us in the first few months of operation.”
“The new centre is a reflection of our ambition to increase long-term resilience and sustainability by building audiences, further developing our artistic programme, and increasing visitor income."
Making sure we meet our environmental obligations is very important to us and our world-leading brands and we look forward to working closely with WPL to meet this requirement.”
"This was a successful project, undertaken to meet regulatory standards for ammonia removal at Cliff Quay Water Recycling Centre WPL’s Hybrid-SAF units play an important part in many of our sites maintaining compliance."
Diamond always meets the schedule for our installation teams. What installers are saying about our 3 to 6 days lead-time for WPL Diamond range.
"Wessex Water customers will benefit from the 75% cost saving on this project and the energy efficiencies achieved will help deliver our sustainability target."
The Sill will be much more than a visitor attraction – it will enable us to reconnect with our landscapes and our heritage. It is important that we seek the highest environmental standards in all our construction and operational activity to minimise disruption to the natural beauty of the area.
The client, United Utilities, chose the ST1000 modules manufactured by WPL because they wanted units that could be moved from site to site after the Huyton project was completed.
WPL’s bespoke design service and factory-build meant that the onsite installation of the HiPAF® midi only took two days.
The modular nature of WPL’s Hybrid-SAFs gives the wastewater treatment plant managers at Sandbach and Lawton Gate flexibility in terms of operation along with the additional capacity required.
To ensure swift installation it was important that on-site mechanical and electrical work was kept to a minimum. WPL’s bespoke design service and factory-build meant that on-site installation of the HiPAF® midi only took two days.